When Challenger Valves relocated to a new purpose-built warehouse on Wheeler Street in Shepparton, they saw it as an opportunity to set their operation up properly from day one. Working with Marcus from All Storage Systems early in the process to ensure the new facility delivered on both immediate operational needs and long-term growth.
Following a detailed consultation to understand how the warehouse would function and the types of products being stored, Marcus and the team developed two tailored pallet racking options for consideration. After reviewing the proposed layouts, the Challenger Valves team refined the configuration and requested the inclusion of mesh decks to increase storage flexibility beyond standard palletised goods.
Once final drawings and pricing were presented, the design was approved in June, allowing the project to move seamlessly into the delivery and installation phase.